About Task 42
The objectives of the proposed IEA Wind Task on wind turbine lifetime extension are to coordinate international research activities towards the assessment of the remaining operational life of wind turbines near the end of their certified design life and identification of strategies for extending the end of useful life.
This will be done through research activities for determining the probability of failure of different wind turbine components upon continued operation, the examination of procedures that demonstrate the feasibility for life extension, the requirements for maintenance, and to recommend findings to international standards and regulatory bodies.
The partners in this task have significant experience on the above topics and also have analyzed measurements from many commercial wind farms.
A key initial part of this task will be to document the existing state-of-the-art lifetime extension as applied to wind turbines and to identify missing segments that are necessary to assess the remaining life of the wind turbine. The usefulness of different types of wind farm data and the volume of data needed to assess remaining life or plan maintenance will be investigated.
The project will on a continual basis quantify the site-specific remaining useful life of different types of wind turbines and the procedures to establish this based on the level of available data from the site. The scope is valid for both onshore and offshore wind turbines. This will be done by assessing different failure modes of components and quantifying the probability of failure of these turbine components upon life extension by utilizing existing data systematically.
Task 42 Roadmap
Phase l
Gap analysis on existing procedures required for life extension
Phase ll
Defining the benchmark study for quantifying uncertainty in life prediction methods
Phase lll
Implementing the benchmark study, investigating structural health monitoring processes and preventive maintenance
Phase lV
Comparison of results from benchmark study and determining the value of data
Phase V
Regulatory frameworks and recommendations to standards
Phase Vl
Final IEA Task report with recommended verified practice for life extension
Participation
Who can participate in Task 42?
To participate in the research activities of Task 42, researchers must reside in a country that participates in the IEA Wind Agreement AND has agreed by official letter to participate in Task 42. The participating member country of the IEA Wind TCP must designate a lead institution that agrees to the obligations of Task participation (pay the annual fee and agree to perform specified parts of the work plan).
Active researchers (performing part of the work plan) benefit from meetings and professional exchange during the term of the Task. Countries participating in the Task benefit from the information developed by the Task. The value of the research performed is many times the cost of the country participation fee or the labor contributed to carrying out the work plan.
For more information, contact the temporary Operating Agent, Asger Bech Abrahamsen, or the IEA Wind TCP Secretariat.
Operating Agent
Please contact the Operating Agent below with any questions
Any Question at
Tel: +45 93 51 15 11
DTU Wind Energy
DTU Risø Campus
Frederiksborgvej 399
4000 Roskilde
Denmark
Monday to Friday
9 am – 17 pm Central European Time
Send your mail at
asab@dtu.dk