Forecasting in the design phase
WS: | WP1 Weather | WP2 Power | WP3 Applications | Deliverable | #, Due | Collaboration |
Forecasting in the design phase (WP3) | X | Task 50 (hybrids), PV T16, hydrogen TCP |
An assessment of the expected forecasting accuracy for a given site was already investigated for a single case. However, since then it has been quiet. The new Task will analyze the tradeoffs between normal siting of the turbines, and the forecast capability type.